Base type:Pile

"Pile Factory: Find high-quality pile products at our factory. We offer a wide range of pile options for all your construction needs. Shop now!

Request a Quote
  • Base type:Pile

PRODUCTS DETAILS

WindSpeed : < 42m/s Snowload : 1 4KN/m2 standard: AS1170.2 Degree: 0*-70 Arangement: Vertical Warranty: 10 years1 Install pile frst and then install column upon pile. And then, istall main beam and diagonal I brace on this column. 2 Install mounting rail upon mainbeam 3 tallPrl panels bv mid demp and end clamps.
Mounting rail ,Main beam, Diagonal brace, Back support Ground screw Single Post End clamp kit Mid clamp kit
 Concrete slab flat roof solar mounting (3)  Base typePile (1)  Concrete slab flat roof solar mounting (1)  Metal roof solar mounting (3)  Metal roof solar mounting (2)
Two rows panels with vertical, this is normal type solar mounting system for ground. Ground screw 2 rows panels with vertical solar mounting systemSpecification: Wind Speed : < 42m/s Snow load : 1 .4 KN/m2 Standard : AS1170.2 Degree: 0-70 Arrangement : Vertical Warranty: 10years Installation Manual: 1.Install Piles first, and then install column upon pile. And then install main beam and diagonal brace. Diagonal brace from rear post to main beam. 2.Install mounting rail upon main beam 3.Install PV panels by mid clamp and end clamps.Main parts shown as bellowGround screw 3 rows with landscape solar mounting system According to actual factors and requirements, sometimes 3 panels with landscape type will be used.Specification: Wind Speed :< 42m/s Snow load :1.4 KN/m2 Standard :AS1170.2 Degree :0°-70 Arrangement :Horizontal Warranty:10 years Installation Manual: 1.Install Piles first, and then install column upon pile. And then install main beam(horizontal) and back support on 2 rear columns. Here Diagonal brace will be connected from rear post to front post. 2.Install mounting rail upon main beam. 3.Install PV panels by mid clamp and end clamps.Main parts shown as bellowGround screw 4 rows with landscape solar mounting system This 4 panels with landscape will be used usually on open filed and big power station.
SpecificationWind Speed < 42m/s Degree 0°-70 Snow load 1.4 KN/m2Arrangement: Horizontal Standard AS1170.2Warranty10 years
Installation Manual: ]1.Install  Piles first,  and then  install  posts  upon  pile.  Install  main  beam  and  diagonal brace. Here Diagonal brace will be connected from rear post to main beam. 2.Install mounting rail upon main beam, here notice there are 5 mounting rails. 3.Install PV panels by mid clamp and end clamps.
Main parts shown as bellowGround screw 4-5 rows with vertical solar mounting system Chasun Solar also provide aluminum alloy structure 4-5 rows of panels with landscape array.
 Specification Wind Speed < 42m/s Degree 0°-70  Snow load 1.4 KN/m2 Arrangement: Horizontal Standard AS1170.2 Warranty10 years
Installation Manual: 1.Install Piles first, and then install column upon pile. And then install main beam, and then install secondary beam with landscape. 2.Install mounting rail upon secondary beam. 3.Install PV panels by mid clamp and end clamps.
Main parts shown as bellowE-pile solar mounting system with 2 rows This type of solar mounting system usually used for Europe market big power station. Easy to install and save labor cost.
Specification:Wind Speed :< 42m/s Degree :0°-70 Snow load :1.4 KN/m2Arrangement :Vertical Standard :AS1170.2Warranty:10 years
Installation Manual:Installation Manual:1.Install Pile first, And then install main beam and diagonal brace on this column. 2.Install mounting rail upon main beam 3.Install PV panels by mid clamp and end clamps 4.Here for pile, we can use    “∑ ”or    “几”type
Main parts shown as bellowConcrete pile solar mounting system This type solar mounting system mainly use for some area which is hard to use normal pile or concrete foundation as base. Also its structure usually used for lake or low-lever ground area.Specification: Wind Speed : < 42m/s Snow load: 1.4 KN/m2 Standard: AS1170.2 Degree: 0°-70 Arrangement : Vertical Warranty: 10 years Installation Manual: 1 Install Concrete and Pile frst, make concrete pile and take steel pile in it. and then install column upon pile. And then install main beam and diagonal braces on thiscolumn. 2.Install mounting rail upon main beam 3.Install PV panels by mid clamp and end clamps.Main parts shown as bellow

Hot Products

YINGLI YLM-J 3.0 PRO 530-555W YL555D-49e 1/2

YINGLI YLM-J 3.0 PRO 530-555W YL555D-49e 1/2

YINGLI YLM-J 3.0 PRO 530-555W YL555D-49e 1/2

YINGLI YLM-J 3.0 PRO 530-555W YL555D-49e 1/2

JINKO Tiger Neo N-type 78HL4-BDV 605-625 Watt

JINKO Tiger Neo N-type 78HL4-BDV 605-625 Watt

Deye Hybrid Inverter SUN-12/14/16K-SG01LP1

Deye Hybrid Inverter SUN-12/14/16K-SG01LP1

Deye Hybrid inverter SUN-6/8/10/12/15/20K-SG01HP3 Suitable for Europe

Deye Hybrid inverter SUN-6/8/10/12/15/20K-SG01HP3 Suitable for Europe

GROWATT Residential PV Inverter MIC 750-3300TL-X

GROWATT Residential PV Inverter MIC 750-3300TL-X

Trina Vertex N  TSM-DE20  590-610W

Trina Vertex N TSM-DE20 590-610W

RISEN TITANS  RSM120-8-585BMDG-610BMDG

RISEN TITANS RSM120-8-585BMDG-610BMDG

TWMPF-66HD650-670W

TWMPF-66HD650-670W

TWMPD-66HS490-510W

TWMPD-66HS490-510W

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours